Steyrmühl

Traunbrücke Steyrermühl

Austria

hide

While one of the bridge structures was removed (blown), the remaining structure was monitored in order to evaluate the impact of the blasting with regard to its structural safety and operability. The investigation was focused on the primary load-bearing structure (arch).

Services: Dynamic measurements, Life Cycle Analysis